Monday, May 30, 2011

The Walk-Through

Tomorrow I'm supposed to meet the agent at my unit to complete the final walk through. The walk-through is supposed to happen a few days prior to the close of escrow so that the buyer can see that there has been no adverse change to the unit before the purchase is completed. The agents provide the buyer with a checklist and they check off to ensure that everything is repaired and meets the buyer standards.

The only thing that I need to 'check off' will be the floors and the room divider, per my 'upgrade' package I got when I purchased the unit, the developer is to polish the concrete floors and build a room divider between the sleeping area and the living room.

This is the view facing the sleeping area of the loft, hopefully, by this time tomorrow the floors will be polished there will be a divider built on the wall by the second pillar. I tend to think that the room divider will make unit appear bigger than it appears with nothing there. At 670 sq feet, this unit is pretty small, so I was thinking of building an office in one of the two closets to the right of the picture. I would put my computer and office items into a built structure in the closet. This would solve two problems, the lack of space for my current desk and I wouldn't have to move my current desk.

I hate moving. The less stuff I have to move, the better. I'm hoping this will be the last time I have to move for a long time.

1 comment:

  1. i hate moving too - and i have to do it *twice* this summer. selling all my chicago shit has been pretty painless though. now i get to do it all again right away in cali . . .

    ReplyDelete